The removal of insulation is almost complete on the north and east sides of A-East with the south side scheduled over the next week.
It is exciting to see the project moving forward!
Abbotsford Campus Building Renewal Project
The removal of insulation is almost complete on the north and east sides of A-East with the south side scheduled over the next week.
It is exciting to see the project moving forward!
Classes started in Building K on Monday November 4th. Pictures can be found on the UFV flickr album.
A huge thank you to all our volunteers who helped with directions, furnished hot chocolate, and classroom locations!
As the hoarding is finalized outside of A-East, the wheelchair access is changing. A wheelchair ramp has been added to the stairs by the bus loop. This temporary ramp will be in place until late April/early May.
The next phase of UFV’s Building Renewal Project on the Abbotsford campus begins Monday, Sept 30. While the timing and type of work have been scheduled to minimize inconvenience, door access from the east side of Building A will be closed for a short period and some construction noise will occur. What is happening? Mon, … Read more
As part of the UFV Building Renewal Project, construction has started on the exterior of Building A East on the Abbotsford campus. The construction site office is now set up in the south half of parking Lot 7. Between Sept 23 and Sept 30 materials will arrive and construction walls will be installed around Building … Read more
The following changes are part of the Abbotsford Building Renewal Project. Thursday, Sept. 12 only: Access to Lot 7 from McKenzie Road near Building A in Abbotsford will be blocked for 2 hours from 8am to 10am. Site preparation for the Renewal Project will be occurring. Access will be through lot 6. Monday, Sept. 16 onward: … Read more
An energy efficiency study will take place in Building D on the Abbotsford Campus on Friday, August 23 and Saturday, August 24 as part of the UFV Building Renewal project. Building D will be closed (no access) on Saturday, August 24 as testing is done to measure and establish baselines for energy use and to … Read more
Plant removal around the exterior walls of Abbotsford Building A-East will occur on three days in the period between Wed, July 24 and Wed, July 31. Yard Pro crews will be working with power tools and excavators along the perimeter of Building A as part of the Building Renewal Project. Work will begin at 8am … Read more