A-East stairwell going to 4th floor

Scaffolding has been installed going from the third floor to the fourth floor in A-East.  The elevator and the stairs at the far end of A-East are still available should you need to go up or down.

The scaffolding will be in place for most of the summer.  It is required for the windows at the top of the stair tower to be replaced.