Tag Archives | SUB

New Student Union Building opens on UFV Abbotsford campus

The University of the Fraser Valley (UFV) and the UFV Student Union Society (SUS) officially opened the university’s first Student Union Building (SUB) on Sept 8. The leading edge $17.3 million, 46,700 square foot SUB represents the culmination of a collaborative design and construction effort that began in 2008. The SUB incorporates LEED Gold principles […]

Soft opening for Student Union Building as first groups move in

UFV Student Union Society President Thomas Davies is like a proud new homeowner as he leads people through the brand new Student Union Building at UFV. He shows off the entrance way (a massive atrium), the entertainment room (a huge conference space that can be divided into three meeting rooms), and the dining room (a […]

UFV and Student Union Society team up on Student Union Building

The University of the Fraser Valley and the UFV Student Union Society are working together to realize a long-term dream of opening a Student Union Building on the Abbotsford campus. Construction began in mid-September 2013 on the building, which will be located west of the gymnasium complex and south of Building D. The $15-million project […]