ABB – Notice of Reduced Access – Building E Main Entrance

ABB – Notice of Reduced Access – Building E Main Entrance

WHEN: September 22, 2025, all day

WHERE: Inside Student Housing Construction Site, Building J, Parking Lot 10; Directly in front of the Building E main entrance

WHAT:
A concrete truck will be on site within the student housing construction site. The concrete truck will be parked which is directly in front of the main entrance to building E. The immediate area plus one parking stall will be fenced off for safety purposes. The main entrance will still be accessible but only via the south entrance (left of the building).

PROJECT OWNER REPRESENTATIVE: Ashley Hunter, Project Coordinator, UFV, (604) 217-1373 // ProjectOffice@ufv.ca