{"id":92,"date":"2023-03-02T18:42:09","date_gmt":"2023-03-02T18:42:09","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=92"},"modified":"2023-03-02T18:42:09","modified_gmt":"2023-03-02T18:42:09","slug":"building-c-electrical-shut-down","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2023\/03\/02\/building-c-electrical-shut-down\/","title":{"rendered":"Building C &#8211; Electrical Shut Down"},"content":{"rendered":"<p><strong>\u00a0<\/strong><strong>WHO: <\/strong>Edifice Construction, Kellan Savoy, Operations Manager, 778-984-3746, <a href=\"mailto:Kellan.s@edifice.ca\">Kellan.s@edifice.ca<\/a><\/p>\n<p><strong>\u00a0<\/strong><strong>WHEN: <\/strong>Saturday, March 4<sup>th<\/sup>, from 8 AM to 3 PM<\/p>\n<p><strong>\u00a0<\/strong><strong>WHERE: <\/strong>Building C, 1<sup>st<\/sup> Floor, Southside Classrooms<\/p>\n<p><strong>\u00a0<\/strong><strong>WHAT: <\/strong>Marathon Electric will be shutting down power to a section of classrooms and offices on the southside of Building C. They will be shutting the power off for the duration of hours listed about for light installations. No power will be available in the building during this time<\/p>\n<p><strong>\u00a0<\/strong><strong>PROJECT OWNER: <\/strong>UFV \u2013 Sunny Rajwan, Project Manager, 604-236-1361<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0WHO: Edifice Construction, Kellan Savoy, Operations Manager, 778-984-3746, Kellan.s@edifice.ca \u00a0WHEN: Saturday, March 4th, from 8 AM to 3 PM \u00a0WHERE: Building C, 1st Floor, Southside Classrooms \u00a0WHAT: Marathon Electric will be shutting down power to a section of classrooms and offices on the southside of Building C. They will be shutting the power off for &#8230; <a title=\"Building C &#8211; Electrical Shut Down\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2023\/03\/02\/building-c-electrical-shut-down\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[8],"tags":[],"class_list":["post-92","post","type-post","status-publish","format-standard","hentry","category-abb-building-c-renovations"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/92","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=92"}],"version-history":[{"count":1,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/92\/revisions"}],"predecessor-version":[{"id":93,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/92\/revisions\/93"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=92"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=92"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=92"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}