{"id":60,"date":"2022-11-29T20:06:11","date_gmt":"2022-11-29T20:06:11","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=60"},"modified":"2022-11-29T20:07:51","modified_gmt":"2022-11-29T20:07:51","slug":"abb-building-d-overnight-electrical-repair-tuesday-november-29","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2022\/11\/29\/abb-building-d-overnight-electrical-repair-tuesday-november-29\/","title":{"rendered":"ABB &#8211; Building D \u2013 Overnight Electrical Repair \u2013 Tuesday, November 29"},"content":{"rendered":"<p><strong>What do I need to know?<\/strong><\/p>\n<p>Building D on the Abbotsford Campus will have an electrical repair happen overnight tonight. This repair will affect all floors of Building D from 10:00 PM Tuesday night to 12:00 AM Wednesday Morning.<\/p>\n<p><strong>Why?<\/strong><\/p>\n<p><span style=\"color: black;\">Continued <\/span><span style=\"color: #242424;\">electrical repair the power imbalance by repairing the connection in the electrical transformer on D building 1<sup>st<\/sup> floor. The work will be affecting the D3 and D4 mechanical room as well as the D building HVAC AND Boiler systems.<\/span><\/p>\n<p><strong>Who is impacted?<\/strong><\/p>\n<p>Anyone using Building D during this time.<\/p>\n<p><strong>What do I need to do?<\/strong><\/p>\n<p>No action is required.<\/p>\n<p><strong>Need more info?<\/strong><\/p>\n<p>Contact: Sunny Rajwan, Project Manager, 604-236-1361<\/p>\n","protected":false},"excerpt":{"rendered":"<p>What do I need to know? Building D on the Abbotsford Campus will have an electrical repair happen overnight tonight. This repair will affect all floors of Building D from 10:00 PM Tuesday night to 12:00 AM Wednesday Morning. Why? Continued electrical repair the power imbalance by repairing the connection in the electrical transformer on &#8230; <a title=\"ABB &#8211; Building D \u2013 Overnight Electrical Repair \u2013 Tuesday, November 29\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2022\/11\/29\/abb-building-d-overnight-electrical-repair-tuesday-november-29\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[7,3],"tags":[],"class_list":["post-60","post","type-post","status-publish","format-standard","hentry","category-abb-building-d","category-construction-notices"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/60","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=60"}],"version-history":[{"count":2,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/60\/revisions"}],"predecessor-version":[{"id":62,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/60\/revisions\/62"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=60"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=60"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=60"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}