{"id":57,"date":"2022-11-28T20:24:14","date_gmt":"2022-11-28T20:24:14","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=57"},"modified":"2022-11-28T20:24:53","modified_gmt":"2022-11-28T20:24:53","slug":"building-d-overnight-electrical-repair-monday-november-28","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2022\/11\/28\/building-d-overnight-electrical-repair-monday-november-28\/","title":{"rendered":"Building D \u2013 Overnight Electrical Repair \u2013 Monday, November 28"},"content":{"rendered":"<p><strong>What do I need to know?<\/strong><\/p>\n<p>Building D on the Abbotsford Campus will have an electrical repair happen overnight tonight. This repair will affect all floors of Building D from 10:00 PM Monday night to 12:00 AM Tuesday Morning.<\/p>\n<p><strong>Why?<\/strong><\/p>\n<p>A repair needs to be made to the electrical system to fix a power imbalance. This will be completed by establishing a new ground connection.<\/p>\n<p><strong>Who is impacted?<\/strong><\/p>\n<p>Anyone using Building D during this time.<\/p>\n<p><strong>What do I need to do?<\/strong><\/p>\n<p>No action is required.<\/p>\n<p><strong>Need more info?<\/strong><\/p>\n<p>Contact: Sunny Rajwan, Project Manager, 604-236-1361<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>What do I need to know? Building D on the Abbotsford Campus will have an electrical repair happen overnight tonight. This repair will affect all floors of Building D from 10:00 PM Monday night to 12:00 AM Tuesday Morning. Why? A repair needs to be made to the electrical system to fix a power imbalance. &#8230; <a title=\"Building D \u2013 Overnight Electrical Repair \u2013 Monday, November 28\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2022\/11\/28\/building-d-overnight-electrical-repair-monday-november-28\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[7,3],"tags":[],"class_list":["post-57","post","type-post","status-publish","format-standard","hentry","category-abb-building-d","category-construction-notices"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/57","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=57"}],"version-history":[{"count":2,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/57\/revisions"}],"predecessor-version":[{"id":59,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/57\/revisions\/59"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=57"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=57"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=57"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}