{"id":52,"date":"2022-11-25T17:49:38","date_gmt":"2022-11-25T17:49:38","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=52"},"modified":"2022-11-25T17:58:23","modified_gmt":"2022-11-25T17:58:23","slug":"abb-building-c-fire-alarm-verification-monday-november-29","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2022\/11\/25\/abb-building-c-fire-alarm-verification-monday-november-29\/","title":{"rendered":"ABB Building C &#8211; Fire Alarm Verification &#8211; Tuesday, November 29"},"content":{"rendered":"<p><strong>What do I need to know?<\/strong><\/p>\n<p>Building C on the Abbotsford Campus will have Fire Alarm Verification testing from 7 AM to 4:30 PM. You will need to be aware that the fire alarm\/bells may ring intermittently for about 10 seconds at a time between 7 AM to 4:30 PM.<\/p>\n<p><strong>Why?<\/strong><\/p>\n<p>To link the new fire alarms with the existing system in Building C, and to ensure they are fully operational.<\/p>\n<p><strong>Who is impacted?<\/strong><\/p>\n<p>Everyone who will be utilizing Building C on Tuesday. This will impact any occupant of the building.<\/p>\n<p><strong>What do I need to do?<\/strong><\/p>\n<p>When visiting the building during the scheduled testing period you need to be aware of the testing going on, and that it is a test only.<\/p>\n<p><strong>Need more info?<\/strong><\/p>\n<p>Contact: Sunny Rajwan, Project Manager, 604-236-1361<\/p>\n","protected":false},"excerpt":{"rendered":"<p>What do I need to know? Building C on the Abbotsford Campus will have Fire Alarm Verification testing from 7 AM to 4:30 PM. You will need to be aware that the fire alarm\/bells may ring intermittently for about 10 seconds at a time between 7 AM to 4:30 PM. Why? To link the new &#8230; <a title=\"ABB Building C &#8211; Fire Alarm Verification &#8211; Tuesday, November 29\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2022\/11\/25\/abb-building-c-fire-alarm-verification-monday-november-29\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[8,3],"tags":[],"class_list":["post-52","post","type-post","status-publish","format-standard","hentry","category-abb-building-c-renovations","category-construction-notices"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/52","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=52"}],"version-history":[{"count":4,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/52\/revisions"}],"predecessor-version":[{"id":56,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/52\/revisions\/56"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=52"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=52"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=52"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}