{"id":415,"date":"2025-09-17T21:14:54","date_gmt":"2025-09-17T21:14:54","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=415"},"modified":"2025-09-17T21:14:54","modified_gmt":"2025-09-17T21:14:54","slug":"abb-notice-of-reduced-access-building-e-main-entrance","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2025\/09\/17\/abb-notice-of-reduced-access-building-e-main-entrance\/","title":{"rendered":"ABB &#8211; Notice of Reduced Access &#8211; Building E Main Entrance"},"content":{"rendered":"<p><strong>ABB &#8211; Notice of Reduced Access &#8211; Building E Main Entrance<\/strong><\/p>\n<p><strong>WHEN: <\/strong>September 22, 2025, all day<\/p>\n<p><strong>WHERE: <\/strong>Inside Student Housing Construction Site, Building J, Parking Lot 10; Directly in front of the Building E main entrance<br \/>\n<strong><br \/>\nWHAT: <\/strong>A concrete truck will be on site within the student housing construction site.\u00a0The concrete truck will be parked which is directly in front of the main entrance to building E. The immediate area plus one parking stall will be fenced off for safety purposes. The main entrance will still be accessible but only via the south entrance (left of the building).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-416\" src=\"http:\/\/blogs.ufv.ca\/campus-planning\/files\/2025\/09\/temp-218x300.png\" alt=\"\" width=\"218\" height=\"300\" srcset=\"https:\/\/blogs.ufv.ca\/campus-planning\/files\/2025\/09\/temp-218x300.png 218w, https:\/\/blogs.ufv.ca\/campus-planning\/files\/2025\/09\/temp.png 313w\" sizes=\"auto, (max-width: 218px) 100vw, 218px\" \/><\/p>\n<p><strong>PROJECT OWNER REPRESENTATIVE: <\/strong>Ashley Hunter, Project Coordinator, UFV, (604) 217-1373 \/\/ ProjectOffice@ufv.ca<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ABB &#8211; Notice of Reduced Access &#8211; Building E Main Entrance WHEN: September 22, 2025, all day WHERE: Inside Student Housing Construction Site, Building J, Parking Lot 10; Directly in front of the Building E main entrance WHAT: A concrete truck will be on site within the student housing construction site.\u00a0The concrete truck will be &#8230; <a title=\"ABB &#8211; Notice of Reduced Access &#8211; Building E Main Entrance\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2025\/09\/17\/abb-notice-of-reduced-access-building-e-main-entrance\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[4],"tags":[],"class_list":["post-415","post","type-post","status-publish","format-standard","hentry","category-housing"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=415"}],"version-history":[{"count":1,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/415\/revisions"}],"predecessor-version":[{"id":417,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/415\/revisions\/417"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}