{"id":41,"date":"2022-11-21T16:56:34","date_gmt":"2022-11-21T16:56:34","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=41"},"modified":"2022-11-21T17:25:40","modified_gmt":"2022-11-21T17:25:40","slug":"building-d-fire-alarm-verification-tuesday-november-21","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2022\/11\/21\/building-d-fire-alarm-verification-tuesday-november-21\/","title":{"rendered":"Building D &#8211; Fire alarm verification &#8211; Tuesday, November 22"},"content":{"rendered":"<p><strong>What do I need to know?<\/strong><\/p>\n<p>Building D on the Abbotsford Campus will have Fire Alarm Verification testing from 6 AM to 8 AM. There is a possibility the verification may extended past 8 AM. You will need to be aware that the fire alarm\/bells may ring intermittently for about 10 seconds at a time between 8 AM to 12PM.<\/p>\n<p><strong>Why?<\/strong><\/p>\n<p>To link the new fire alarms with the existing system in Building D, and to ensure they are fully operational.<\/p>\n<p><strong>Who is impacted?<\/strong><\/p>\n<p>Everyone who will be utilizing Building D on Tuesday before noon. This will impact any occupant of the building.<\/p>\n<p><strong>What do I need to do?<\/strong><\/p>\n<p>When visiting the building during the scheduled testing period you need to be aware of the testing going on, and that it is a test only.<\/p>\n<p><strong>Questions?<\/strong><\/p>\n<p>Please contact Sunny Rajwan, Project Manager, 604-236-1361<\/p>\n","protected":false},"excerpt":{"rendered":"<p>What do I need to know? Building D on the Abbotsford Campus will have Fire Alarm Verification testing from 6 AM to 8 AM. There is a possibility the verification may extended past 8 AM. You will need to be aware that the fire alarm\/bells may ring intermittently for about 10 seconds at a time &#8230; <a title=\"Building D &#8211; Fire alarm verification &#8211; Tuesday, November 22\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2022\/11\/21\/building-d-fire-alarm-verification-tuesday-november-21\/\">Read more<\/a><\/p>\n","protected":false},"author":234,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[3],"tags":[],"class_list":["post-41","post","type-post","status-publish","format-standard","hentry","category-construction-notices"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/41","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/234"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=41"}],"version-history":[{"count":2,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/41\/revisions"}],"predecessor-version":[{"id":43,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/41\/revisions\/43"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=41"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=41"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=41"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}