{"id":385,"date":"2025-03-12T17:57:17","date_gmt":"2025-03-12T17:57:17","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=385"},"modified":"2025-03-17T22:43:59","modified_gmt":"2025-03-17T22:43:59","slug":"abb-student-housing-gillis-ave-road-closure-2","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2025\/03\/12\/abb-student-housing-gillis-ave-road-closure-2\/","title":{"rendered":"ABB &#8211; Student Housing &#8211; Gillis Ave. Road Closure"},"content":{"rendered":"<p><strong>WHO: <\/strong>Clark Builders Construction, Tyler Gagan, Project Manager<\/p>\n<p><strong>WHEN: <\/strong>Starting March 21, 2025, to March 31, 2025<\/p>\n<p><strong>WHERE: <\/strong>Gillis Ave., in front of L\u00e1:lem te Baker<\/p>\n<p><strong>WHAT: <\/strong>The construction team for the student housing project requires Gillis Ave to be shut down for the time period above to allow for underground connections to L\u00e1:lem te Baker. The work includes connecting power, and Telus to the new building. The work will be disruptive to occupants of L\u00e1:lem te Baker, and vibrations could carry to other buildings in the vicinity. The most disruptive work will be the excavation of the road and sidewalks, and the compaction testing. The work will take place from Monday, March 24 to Friday, March 28, however the vehicle access and alternate pedestrian route will be in place from Friday, March 21 to Sunday, March 30.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-388\" src=\"http:\/\/blogs.ufv.ca\/campus-planning\/files\/2025\/03\/Gillis-Ave-Closure-March-1024x436.png\" alt=\"\" width=\"1024\" height=\"436\" srcset=\"https:\/\/blogs.ufv.ca\/campus-planning\/files\/2025\/03\/Gillis-Ave-Closure-March-1024x436.png 1024w, https:\/\/blogs.ufv.ca\/campus-planning\/files\/2025\/03\/Gillis-Ave-Closure-March-300x128.png 300w, https:\/\/blogs.ufv.ca\/campus-planning\/files\/2025\/03\/Gillis-Ave-Closure-March-768x327.png 768w, https:\/\/blogs.ufv.ca\/campus-planning\/files\/2025\/03\/Gillis-Ave-Closure-March.png 1048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><strong>PROJECT OWNER: <\/strong>Ingi El-Hadi, AVP, and Ashley Hunter, Project Coordinator, Campus Planning, projectoffice@ufv.ca<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WHO: Clark Builders Construction, Tyler Gagan, Project Manager WHEN: Starting March 21, 2025, to March 31, 2025 WHERE: Gillis Ave., in front of L\u00e1:lem te Baker WHAT: The construction team for the student housing project requires Gillis Ave to be shut down for the time period above to allow for underground connections to L\u00e1:lem te &#8230; <a title=\"ABB &#8211; Student Housing &#8211; Gillis Ave. Road Closure\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2025\/03\/12\/abb-student-housing-gillis-ave-road-closure-2\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-385","post","type-post","status-publish","format-standard","hentry","category-project-updates"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/385","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=385"}],"version-history":[{"count":4,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/385\/revisions"}],"predecessor-version":[{"id":390,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/385\/revisions\/390"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=385"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=385"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=385"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}