{"id":380,"date":"2024-11-27T00:19:07","date_gmt":"2024-11-27T00:19:07","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=380"},"modified":"2024-11-27T00:19:44","modified_gmt":"2024-11-27T00:19:44","slug":"abb-building-e-showers-washroom-temporary-closure","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2024\/11\/27\/abb-building-e-showers-washroom-temporary-closure\/","title":{"rendered":"ABB &#8211; Building E &#8211; Showers &#038; Washroom Temporary Closure"},"content":{"rendered":"<p><strong>Project Office Construction Bulletin<br \/>\n<\/strong><\/p>\n<p><strong>WHO: <\/strong>Jordan Loewen, Gerry Enns Contracting, <a href=\"tel:+1604%208198378\">604 819-8378<\/a><strong><br \/>\n<\/strong><\/p>\n<p><strong>WHEN: Monday, <\/strong>Dec 2<sup>nd<\/sup> at 7:00 a.m. to Wednesday, 4<sup>th<\/sup>, 2024 at 5:00 p.m.<\/p>\n<p><strong>WHERE: <\/strong>Building ABB E &#8211; E153 &amp; E161 Showers &amp; washrooms.<\/p>\n<p><strong>WHAT: <\/strong>The doors &amp; panels at E153 &amp; E161 Showers &amp; washrooms going to be lower down. The area will be closed off for renovations. There will be signage, and the contractor will cover E153 &amp; E161 spaces. Use caution when navigating the corridors.<\/p>\n<p><strong>PROJECT OWNER: <\/strong>Gagan Batra, Project Coordinator Technician, (236) 622-5802,<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Office Construction Bulletin WHO: Jordan Loewen, Gerry Enns Contracting, 604 819-8378 WHEN: Monday, Dec 2nd at 7:00 a.m. to Wednesday, 4th, 2024 at 5:00 p.m. WHERE: Building ABB E &#8211; E153 &amp; E161 Showers &amp; washrooms. WHAT: The doors &amp; panels at E153 &amp; E161 Showers &amp; washrooms going to be lower down. The &#8230; <a title=\"ABB &#8211; Building E &#8211; Showers &#038; Washroom Temporary Closure\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2024\/11\/27\/abb-building-e-showers-washroom-temporary-closure\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[3],"tags":[],"class_list":["post-380","post","type-post","status-publish","format-standard","hentry","category-construction-notices"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/380","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=380"}],"version-history":[{"count":3,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/380\/revisions"}],"predecessor-version":[{"id":383,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/380\/revisions\/383"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=380"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=380"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=380"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}