{"id":378,"date":"2024-11-21T20:11:11","date_gmt":"2024-11-21T20:11:11","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=378"},"modified":"2024-11-27T00:27:38","modified_gmt":"2024-11-27T00:27:38","slug":"abb-dhe-temporary-water-shutdown","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2024\/11\/21\/abb-dhe-temporary-water-shutdown\/","title":{"rendered":"ABB &#8211; DHE &#8211; Temporary Water Shutdown"},"content":{"rendered":"<p><strong>Project Office Construction Bulletin<\/strong><\/p>\n<p><strong>WHO: <\/strong>Turner Construction, Gary Cable, Site Superintendent<\/p>\n<p><strong>WHEN: <\/strong>Friday, November 22, 2024 \u2013 From 6 AM to 8:30 AM<\/p>\n<p><strong>WHERE: <\/strong>Building B, Abbotsford Campus<\/p>\n<p><strong>WHAT: <\/strong>Temporary shutdown of water to Levels 2 and 3 in building B. The water lines look to run to exterior water connections, however, the construction team is looking to confirm this.<\/p>\n<p>This shutdown has the potential to impact the shared kitchen between O\u2019Reg and International, along with the Presidents office kitchen.<\/p>\n<p><strong>PROJECT OWNER: <\/strong>Shelley Young, UFV Senior Campus Designer, <a href=\"mailto:projectoffice@ufv.ca\">projectoffice@ufv.ca<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Office Construction Bulletin WHO: Turner Construction, Gary Cable, Site Superintendent WHEN: Friday, November 22, 2024 \u2013 From 6 AM to 8:30 AM WHERE: Building B, Abbotsford Campus WHAT: Temporary shutdown of water to Levels 2 and 3 in building B. The water lines look to run to exterior water connections, however, the construction team &#8230; <a title=\"ABB &#8211; DHE &#8211; Temporary Water Shutdown\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2024\/11\/21\/abb-dhe-temporary-water-shutdown\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[16],"tags":[],"class_list":["post-378","post","type-post","status-publish","format-standard","hentry","category-abb-building-b-renovations"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/378","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=378"}],"version-history":[{"count":2,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/378\/revisions"}],"predecessor-version":[{"id":384,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/378\/revisions\/384"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=378"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=378"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=378"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}