{"id":368,"date":"2024-11-13T17:02:49","date_gmt":"2024-11-13T17:02:49","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=368"},"modified":"2024-11-13T17:02:49","modified_gmt":"2024-11-13T17:02:49","slug":"abb-lot-7-partial-parking-lot-closure","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2024\/11\/13\/abb-lot-7-partial-parking-lot-closure\/","title":{"rendered":"ABB &#8211; Lot 7 &#8211; Partial Parking Lot Closure"},"content":{"rendered":"<p><strong>Facilities Construction Bulletin<\/strong><\/p>\n<p><strong>WHEN:<\/strong> From Friday, November 15, 2024 to Friday, December 20, 2024<br \/>\n<strong><br \/>\nWHERE: <\/strong>Northeast portion of Lot 7 on the Abbotsford Campus (Impacting 12 Parking Stalls)<br \/>\n<strong><br \/>\nWHAT: <\/strong>The retaining wall on the northeast side of the Lot 7 parking lot needs repairs. The parking lot will provide a laydown area for all equipment required to repair the wall and will be blocked off for this.<br \/>\n<strong><br \/>\nPROJECT OWNER: <\/strong>Maurice Bedard, Associate Director, Building Systems &amp; Services, CPFM \u2013 (236) 622-2697 \u2013 <a href=\"mailto:facilitiesservicedesk@ufv.ca\">facilitiesservicedesk@ufv.ca<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Facilities Construction Bulletin WHEN: From Friday, November 15, 2024 to Friday, December 20, 2024 WHERE: Northeast portion of Lot 7 on the Abbotsford Campus (Impacting 12 Parking Stalls) WHAT: The retaining wall on the northeast side of the Lot 7 parking lot needs repairs. The parking lot will provide a laydown area for all equipment &#8230; <a title=\"ABB &#8211; Lot 7 &#8211; Partial Parking Lot Closure\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2024\/11\/13\/abb-lot-7-partial-parking-lot-closure\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[27],"tags":[],"class_list":["post-368","post","type-post","status-publish","format-standard","hentry","category-facilities-management"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/368","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=368"}],"version-history":[{"count":3,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/368\/revisions"}],"predecessor-version":[{"id":371,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/368\/revisions\/371"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=368"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=368"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=368"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}