{"id":262,"date":"2024-04-23T18:53:04","date_gmt":"2024-04-23T18:53:04","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=262"},"modified":"2024-04-23T18:54:25","modified_gmt":"2024-04-23T18:54:25","slug":"abb-dining-hall-upcoming-disruptive-work","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2024\/04\/23\/abb-dining-hall-upcoming-disruptive-work\/","title":{"rendered":"ABB &#8211; Dining Hall &#8211; Upcoming Disruptive Work"},"content":{"rendered":"<h2><strong>Project Office Construction Bulletin<br \/>\n<\/strong><\/h2>\n<p><strong>WHO: <\/strong>Turner Construction, Gary Cable, Site Superintendent<\/p>\n<p><strong>WHEN: <\/strong>Beginning Wednesday, April 24 through to June 2024<\/p>\n<p><strong>WHERE: <\/strong>Abbotsford Campus Dining Hall Expansion Renovation<\/p>\n<p><strong>WHAT: <\/strong>The dining hall expansion will have noisy, disruptive work completed over the upcoming weeks.<\/p>\n<p>Work being completed will included (but not limited to):<\/p>\n<p><strong>Level 1 &amp; Level 2 Interior Slab removal (Medium to High Disruption \u2013 Will Begin Wednesday, April 24 \u2013 Estimated Completion, Wednesday, May 8.)<\/strong><br \/>\nIncludes three to five days of saw cutting on the patio, with some jackhammering intermittently.<br \/>\nLevel 1 will have digging completed on site for approximately ten days.<\/p>\n<p><strong>Cement stair removal (Highest Disruption \u2013 Will Begin Friday, April 26 \u2013 Estimated Completion, Friday, May 3.)<\/strong><br \/>\nDeconstruction of the staircase and removal will involve loud power tools, and concrete debris in the area. Vibrations, and loud noise is to be expected.<\/p>\n<p><strong>Excavation &amp; Foundation Work (Highest Disruption \u2013 Will Begin Monday, May 6 \u2013 Estimated Completion in Four to Five weeks)<\/strong><br \/>\nExcavation around future elevator pit, and foundation areas for the expansion. This will involve large and noisy equipment.<br \/>\nFoundation work will include drilling and boring, with eventual concrete pour.<br \/>\nExcavation and foundation work are expected to be noisy and disruptive.<\/p>\n<p><strong>PROJECT OWNER: <\/strong>Shelley Young, UFV Senior Campus Designer, <a href=\"mailto:projectoffice@ufv.ca\">projectoffice@ufv.ca<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Office Construction Bulletin WHO: Turner Construction, Gary Cable, Site Superintendent WHEN: Beginning Wednesday, April 24 through to June 2024 WHERE: Abbotsford Campus Dining Hall Expansion Renovation WHAT: The dining hall expansion will have noisy, disruptive work completed over the upcoming weeks. Work being completed will included (but not limited to): Level 1 &amp; Level &#8230; <a title=\"ABB &#8211; Dining Hall &#8211; Upcoming Disruptive Work\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2024\/04\/23\/abb-dining-hall-upcoming-disruptive-work\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"aside","meta":{"generate_page_header":"","footnotes":""},"categories":[5,12,3],"tags":[],"class_list":["post-262","post","type-post","status-publish","format-aside","hentry","category-abb-dining-hall-expansion","category-dining-hall-expansion","category-construction-notices","post_format-post-format-aside"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/262","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=262"}],"version-history":[{"count":7,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/262\/revisions"}],"predecessor-version":[{"id":269,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/262\/revisions\/269"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=262"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=262"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}