{"id":26,"date":"2022-08-02T18:44:15","date_gmt":"2022-08-02T18:44:15","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=26"},"modified":"2022-11-02T18:46:02","modified_gmt":"2022-11-02T18:46:02","slug":"dining-hall-geotechnical-work-thurs-aug-18","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2022\/08\/02\/dining-hall-geotechnical-work-thurs-aug-18\/","title":{"rendered":"Dining Hall geotechnical work Thurs Aug 18"},"content":{"rendered":"<p><strong>What do I need to know?<\/strong><br \/>\nGeotechnical work will be conducted on the Abbotsford green near UFV\u2019s Cafeteria in Building B on Thurs, Aug 18. This will include drilling three holes in the soil.<\/p>\n<p><strong>What time?<\/strong><br \/>\n8am until approximately 2pm.<\/p>\n<p><strong>Why?<\/strong><br \/>\nIn preparation for UFV\u2019s <a href=\"http:\/\/What do I need to know?  Geotechnical work will be conducted on the Abbotsford green near UFV\u2019s Cafeteria in Building B on Thurs, Aug 18. This will include drilling three holes in the soil.     What time?  8am until approximately 2pm.  Why?  In preparation for UFV\u2019s Dining Hall expansion project.     Who is impacted?  Pedestrians may be redirected, and a diesel machine will run intermittently outdoors. No services are affected.   Thank you for your patience. Sincerely, Campus Planning &amp; Facilities Management\">Dining Hall expansion project<\/a>.<\/p>\n<p><strong>Who is impacted?<\/strong><br \/>\nPedestrians may be redirected, and a diesel machine will run intermittently outdoors. No services are affected.<\/p>\n<p>Thank you for your patience.<br \/>\nSincerely,<br \/>\nCampus Planning &amp; Facilities Management<\/p>\n","protected":false},"excerpt":{"rendered":"<p>What do I need to know? Geotechnical work will be conducted on the Abbotsford green near UFV\u2019s Cafeteria in Building B on Thurs, Aug 18. This will include drilling three holes in the soil. What time? 8am until approximately 2pm. Why? In preparation for UFV\u2019s Dining Hall expansion project. Who is impacted? Pedestrians may be &#8230; <a title=\"Dining Hall geotechnical work Thurs Aug 18\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2022\/08\/02\/dining-hall-geotechnical-work-thurs-aug-18\/\">Read more<\/a><\/p>\n","protected":false},"author":234,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[5],"tags":[],"class_list":["post-26","post","type-post","status-publish","format-standard","hentry","category-abb-dining-hall-expansion"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/26","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/234"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=26"}],"version-history":[{"count":1,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/26\/revisions"}],"predecessor-version":[{"id":27,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/26\/revisions\/27"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=26"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=26"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=26"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}