{"id":222,"date":"2024-03-07T17:50:47","date_gmt":"2024-03-07T17:50:47","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=222"},"modified":"2024-03-07T17:52:48","modified_gmt":"2024-03-07T17:52:48","slug":"fandgpathwayclosure","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2024\/03\/07\/fandgpathwayclosure\/","title":{"rendered":"ABB &#8211; Student Housing &#8211; Pathway Closure Between F &#038; G Building"},"content":{"rendered":"<p><strong>Project Office Construction Bulletin<\/strong><\/p>\n<p><strong>WHO: <\/strong>Tyler Gagan, Clark Builders Construction, 587-357-8519<br \/>\n<strong><br \/>\nWHEN: <\/strong>Monday March 11<sup>th<\/sup>, 2024, to Monday, March 25<sup>th<\/sup>, 2024<br \/>\n<strong><br \/>\nWHERE: <\/strong>Abbotsford Campus, Walkway between building G and F<\/p>\n<p><strong>WHAT: <\/strong>For the upcoming Student Housing project the pathway to the green between building G and F will be closed temporarily. The construction team will be digging a trench from the south side of G building towards the new student housing location (parking lot 10). This area will be fenced off and secured for the safety of the construction team and pedestrians.<\/p>\n<p>There will be lighting modifications in this area as well. The existing light posts will be removed for the trenching work, and temporary security lighting will be installed.<\/p>\n<p>Below is a map of the area directly impacted by this construction work.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-223\" src=\"http:\/\/blogs.ufv.ca\/campus-planning\/files\/2024\/03\/F-and-G-Pathway.png\" alt=\"\" width=\"624\" height=\"358\" srcset=\"https:\/\/blogs.ufv.ca\/campus-planning\/files\/2024\/03\/F-and-G-Pathway.png 624w, https:\/\/blogs.ufv.ca\/campus-planning\/files\/2024\/03\/F-and-G-Pathway-300x172.png 300w\" sizes=\"auto, (max-width: 624px) 100vw, 624px\" \/><\/p>\n<p><strong>PROJECT OWNER: <\/strong>Lily Chan, UFV Capital Projects Director, (778) 982-0217<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Office Construction Bulletin WHO: Tyler Gagan, Clark Builders Construction, 587-357-8519 WHEN: Monday March 11th, 2024, to Monday, March 25th, 2024 WHERE: Abbotsford Campus, Walkway between building G and F WHAT: For the upcoming Student Housing project the pathway to the green between building G and F will be closed temporarily. The construction team will &#8230; <a title=\"ABB &#8211; Student Housing &#8211; Pathway Closure Between F &#038; G Building\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2024\/03\/07\/fandgpathwayclosure\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[15,4,3],"tags":[],"class_list":["post-222","post","type-post","status-publish","format-standard","hentry","category-new-student-housing","category-housing","category-construction-notices"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/222","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=222"}],"version-history":[{"count":2,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/222\/revisions"}],"predecessor-version":[{"id":225,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/222\/revisions\/225"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=222"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=222"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=222"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}