{"id":216,"date":"2024-02-26T08:30:01","date_gmt":"2024-02-26T08:30:01","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=216"},"modified":"2024-02-20T22:12:35","modified_gmt":"2024-02-20T22:12:35","slug":"abb-student-housing-building-g-basement-coring","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2024\/02\/26\/abb-student-housing-building-g-basement-coring\/","title":{"rendered":"ABB &#8211; Student Housing &#8211; Building G Basement Coring"},"content":{"rendered":"<p><strong>Project Office Construction Bulletin<br \/>\n<\/strong><strong><br \/>\nWHO: <\/strong>Tyler Gagnon, Clark Builders Construction, (587) 357-8519<br \/>\n<strong><br \/>\nWHEN: <\/strong>Thursday February 29<sup>th<\/sup>, 2024, All Day<br \/>\n<strong><br \/>\nWHERE: <\/strong>Abbotsford Campus, Building G basement<\/p>\n<p><strong>WHAT: <\/strong>Coring of the cement walls in the basement of G building. There are 4 holes to core through the wall next to the door and 6 on the concrete retaining wall next to the garbage enclosure. There will be no impact to anyone outside of possible vibrations to anyone on G1 above the basement. This is not expected to be loud work.<\/p>\n<p><strong>PROJECT OWNER: <\/strong>Lily Chan, UFV Capital Projects Director, (778) 982-0217<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Office Construction Bulletin WHO: Tyler Gagnon, Clark Builders Construction, (587) 357-8519 WHEN: Thursday February 29th, 2024, All Day WHERE: Abbotsford Campus, Building G basement WHAT: Coring of the cement walls in the basement of G building. There are 4 holes to core through the wall next to the door and 6 on the concrete &#8230; <a title=\"ABB &#8211; Student Housing &#8211; Building G Basement Coring\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2024\/02\/26\/abb-student-housing-building-g-basement-coring\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[4,15],"tags":[],"class_list":["post-216","post","type-post","status-publish","format-standard","hentry","category-housing","category-new-student-housing"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/216","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=216"}],"version-history":[{"count":1,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/216\/revisions"}],"predecessor-version":[{"id":217,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/216\/revisions\/217"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=216"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=216"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=216"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}