{"id":123,"date":"2023-04-20T17:35:29","date_gmt":"2023-04-20T17:35:29","guid":{"rendered":"https:\/\/blogs.ufv.ca\/campus-planning\/?p=123"},"modified":"2023-04-20T17:35:29","modified_gmt":"2023-04-20T17:35:29","slug":"abbotsford-campus-surveying","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/campus-planning\/2023\/04\/20\/abbotsford-campus-surveying\/","title":{"rendered":"Abbotsford Campus Surveying"},"content":{"rendered":"<p><strong>Project Office Construction Bulletin<\/strong><\/p>\n<p><strong>WHO: <\/strong>Wade &amp; Associates Land Surveying Ltd.<\/p>\n<p><strong>WHEN: <\/strong>Thursday, April 20 &amp; Friday, April 21 from 8am to 6pm.<\/p>\n<p><strong>WHERE: <\/strong>\u00a0General area of \u201cthe Green\u201d access and Lot 10<\/p>\n<p><strong>WHAT: <\/strong>Wade &amp; Associates (W&amp;A) will be on-site, April 20 &amp; April 21 to conduct a topographic survey for the forthcoming Student Housing project.<\/p>\n<p>The below image illustrates the general area of work where W&amp;A will be conducting their survey \u2013 all works is conducted outside.\u00a0 There will be minimal disruption in accessing Campus facilities for Students, Faculty and Staff. The crew will be wearing high visibility vests and will follow WorkSafe BC practices while on-site.<\/p>\n<p><strong><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-110\" src=\"http:\/\/blogs.ufv.ca\/campus-planning\/files\/2023\/03\/SH-Site-Survey-300x248.png\" alt=\"\" width=\"300\" height=\"248\" srcset=\"https:\/\/blogs.ufv.ca\/campus-planning\/files\/2023\/03\/SH-Site-Survey-300x248.png 300w, https:\/\/blogs.ufv.ca\/campus-planning\/files\/2023\/03\/SH-Site-Survey.png 448w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p><strong>PROJECT OWNER: <\/strong>Denise Brown, Director, Capital Projects \u2013 778.982.0217<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Office Construction Bulletin WHO: Wade &amp; Associates Land Surveying Ltd. WHEN: Thursday, April 20 &amp; Friday, April 21 from 8am to 6pm. WHERE: \u00a0General area of \u201cthe Green\u201d access and Lot 10 WHAT: Wade &amp; Associates (W&amp;A) will be on-site, April 20 &amp; April 21 to conduct a topographic survey for the forthcoming Student &#8230; <a title=\"Abbotsford Campus Surveying\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/campus-planning\/2023\/04\/20\/abbotsford-campus-surveying\/\">Read more<\/a><\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":"","footnotes":""},"categories":[4],"tags":[],"class_list":["post-123","post","type-post","status-publish","format-standard","hentry","category-housing"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/123","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/comments?post=123"}],"version-history":[{"count":1,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/123\/revisions"}],"predecessor-version":[{"id":124,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/posts\/123\/revisions\/124"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/media?parent=123"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/categories?post=123"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/campus-planning\/wp-json\/wp\/v2\/tags?post=123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}