ABB – DHE – Temporary Water Shutdown

Project Office Construction Bulletin

WHO: Turner Construction, Gary Cable, Site Superintendent

WHEN: Friday, November 22, 2024 – From 6 AM to 8:30 AM

WHERE: Building B, Abbotsford Campus

WHAT: Temporary shutdown of water to Levels 2 and 3 in building B. The water lines look to run to exterior water connections, however, the construction team is looking to confirm this.

This shutdown has the potential to impact the shared kitchen between O’Reg and International, along with the Presidents office kitchen.

PROJECT OWNER: Shelley Young, UFV Senior Campus Designer, projectoffice@ufv.ca