WHO: Curtis Kushnerik, Clark Builders Construction, (587) 336-0156
WHEN: Thursday January 11th, 2024, to Fall 2025
WHERE: Abbotsford Campus: Parking Lot 10, Building E (Gym) & the Green
WHAT: For the upcoming Student Housing project there are a few closures on the eastern side of Abbotsford Campus.
Access to lot 10 will be blocked off from stalls 923 to 1052 across the parking lot in addition to the current closure. This will remain closed until the completion of the Student Housing project.
Included in this closure are the Level 1 charging stations located outside building F. Alternate charging stations can be found at the following sites on campus:
- Level 2
- Lot 10b (Building C), stalls 1400, 1401
- Lot 10 (Building E), stalls 1308, 1309, 1310, 1311
- Lot 6 (Building A), stalls 703, 704, 705, 706
- Level 3
- Lot 6 (Building A), stalls 701, 702 (out of service due to damage)
Part of the green will be fenced off from building E to building F for construction protection. (See map below for the specific area). This will be a temporary measure until construction shoring is installed.
PROJECT OWNER: Lily Chan, UFV Capital Projects Director, (778) 982-0217