{"id":20597,"date":"2020-06-05T15:56:20","date_gmt":"2020-06-05T15:56:20","guid":{"rendered":"https:\/\/blogs.ufv.ca\/building-renewal\/?p=20597"},"modified":"2020-06-05T15:56:20","modified_gmt":"2020-06-05T15:56:20","slug":"a-east-stairwell-going-to-4th-floor","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/building-renewal\/2020\/06\/05\/a-east-stairwell-going-to-4th-floor\/","title":{"rendered":"A-East stairwell going to 4th floor"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-20598 alignleft\" src=\"https:\/\/blogs.ufv.ca\/building-renewal\/files\/2020\/06\/20200506-Scaffold-in-stairwell-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/blogs.ufv.ca\/building-renewal\/files\/2020\/06\/20200506-Scaffold-in-stairwell-225x300.jpg 225w, https:\/\/blogs.ufv.ca\/building-renewal\/files\/2020\/06\/20200506-Scaffold-in-stairwell-768x1024.jpg 768w, https:\/\/blogs.ufv.ca\/building-renewal\/files\/2020\/06\/20200506-Scaffold-in-stairwell-1152x1536.jpg 1152w, https:\/\/blogs.ufv.ca\/building-renewal\/files\/2020\/06\/20200506-Scaffold-in-stairwell-rotated.jpg 1512w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/p>\n<p>Scaffolding has been installed going from the third floor to the fourth floor in A-East.\u00a0 The elevator and the stairs at the far end of A-East are still available should you need to go up or down.<\/p>\n<p>The scaffolding will be in place for most of the summer.\u00a0 It is required for the windows at the top of the stair tower to be replaced.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Scaffolding has been installed going from the third floor to the fourth floor in A-East.\u00a0 The elevator and the stairs at the far end of A-East are still available should you need to go up or down. The scaffolding will be in place for most of the summer.\u00a0 It is required for the windows at &#8230; <a title=\"A-East stairwell going to 4th floor\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/building-renewal\/2020\/06\/05\/a-east-stairwell-going-to-4th-floor\/\" aria-label=\"More on A-East stairwell going to 4th floor\">Read more<\/a><\/p>\n","protected":false},"author":217,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"image","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-20597","post","type-post","status-publish","format-image","hentry","category-updates","post_format-post-format-image"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/users\/217"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/comments?post=20597"}],"version-history":[{"count":1,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20597\/revisions"}],"predecessor-version":[{"id":20599,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20597\/revisions\/20599"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/media?parent=20597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/categories?post=20597"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/tags?post=20597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}