{"id":20539,"date":"2020-01-14T17:23:36","date_gmt":"2020-01-14T17:23:36","guid":{"rendered":"https:\/\/blogs.ufv.ca\/building-renewal\/?p=20539"},"modified":"2020-01-14T17:23:36","modified_gmt":"2020-01-14T17:23:36","slug":"new-panels-added-to-the-north-side","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/building-renewal\/2020\/01\/14\/new-panels-added-to-the-north-side\/","title":{"rendered":"New panels added to the north side"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-20540 alignright\" src=\"https:\/\/blogs.ufv.ca\/building-renewal\/files\/2020\/01\/20200109-Panels-being-installed-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/blogs.ufv.ca\/building-renewal\/files\/2020\/01\/20200109-Panels-being-installed-300x225.jpg 300w, https:\/\/blogs.ufv.ca\/building-renewal\/files\/2020\/01\/20200109-Panels-being-installed-320x240.jpg 320w, https:\/\/blogs.ufv.ca\/building-renewal\/files\/2020\/01\/20200109-Panels-being-installed.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>The final panels are being added to the north side of A-East. They are covered in plastic for protection and will be revealed as the scaffolding comes down in March!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The final panels are being added to the north side of A-East. They are covered in plastic for protection and will be revealed as the scaffolding comes down in March!<\/p>\n","protected":false},"author":217,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"image","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-20539","post","type-post","status-publish","format-image","hentry","category-updates","post_format-post-format-image"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20539","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/users\/217"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/comments?post=20539"}],"version-history":[{"count":2,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20539\/revisions"}],"predecessor-version":[{"id":20542,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20539\/revisions\/20542"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/media?parent=20539"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/categories?post=20539"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/tags?post=20539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}