{"id":20461,"date":"2019-10-31T20:50:59","date_gmt":"2019-10-31T20:50:59","guid":{"rendered":"https:\/\/blogs.ufv.ca\/building-renewal\/?p=20461"},"modified":"2019-10-31T20:50:59","modified_gmt":"2019-10-31T20:50:59","slug":"replacement-trees","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/building-renewal\/2019\/10\/31\/replacement-trees\/","title":{"rendered":"Replacement trees"},"content":{"rendered":"<p style=\"text-align: left;\">The first group of replaceme<img loading=\"lazy\" decoding=\"async\" class=\"wp-image-20462 alignright\" src=\"https:\/\/blogs.ufv.ca\/building-renewal\/files\/2019\/10\/20191031-Tree-planting-300x225.jpg\" alt=\"\" width=\"327\" height=\"245\" \/>nt trees was planted today at various locations on the Abbotsford campus. UFV&#8217;s policy is to replant the same number, or more, of trees as have been removed.<\/p>\n<p style=\"text-align: left;\">The remainder of trees will be planted after remediation of Building A-East is completed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first group of replacement trees was planted today at various locations on the Abbotsford campus. UFV&#8217;s policy is to replant the same number, or more, of trees as have been removed. The remainder of trees will be planted after remediation of Building A-East is completed.<\/p>\n","protected":false},"author":217,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"image","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-20461","post","type-post","status-publish","format-image","hentry","category-updates","post_format-post-format-image"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20461","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/users\/217"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/comments?post=20461"}],"version-history":[{"count":2,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20461\/revisions"}],"predecessor-version":[{"id":20464,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20461\/revisions\/20464"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/media?parent=20461"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/categories?post=20461"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/tags?post=20461"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}