{"id":20453,"date":"2019-10-29T21:18:49","date_gmt":"2019-10-29T21:18:49","guid":{"rendered":"https:\/\/blogs.ufv.ca\/building-renewal\/?p=20453"},"modified":"2019-10-29T21:23:07","modified_gmt":"2019-10-29T21:23:07","slug":"temporary-wheelchair-ramp","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/building-renewal\/2019\/10\/29\/temporary-wheelchair-ramp\/","title":{"rendered":"Temporary Wheelchair Ramp"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-20455\" src=\"https:\/\/blogs.ufv.ca\/building-renewal\/files\/2019\/10\/20191029-Wheelchair-ramp-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/blogs.ufv.ca\/building-renewal\/files\/2019\/10\/20191029-Wheelchair-ramp-300x225.jpg 300w, https:\/\/blogs.ufv.ca\/building-renewal\/files\/2019\/10\/20191029-Wheelchair-ramp-320x240.jpg 320w, https:\/\/blogs.ufv.ca\/building-renewal\/files\/2019\/10\/20191029-Wheelchair-ramp.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>As the hoarding is finalized outside of A-East, the wheelchair access is changing. A wheelchair ramp has been added to the stairs by the bus loop. This temporary ramp will be in place until late April\/early May.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As the hoarding is finalized outside of A-East, the wheelchair access is changing. A wheelchair ramp has been added to the stairs by the bus loop. This temporary ramp will be in place until late April\/early May.<\/p>\n","protected":false},"author":217,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"image","meta":{"footnotes":""},"categories":[2,1],"tags":[],"class_list":["post-20453","post","type-post","status-publish","format-image","hentry","category-building-renewal","category-updates","post_format-post-format-image"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20453","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/users\/217"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/comments?post=20453"}],"version-history":[{"count":4,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20453\/revisions"}],"predecessor-version":[{"id":20458,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20453\/revisions\/20458"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/media?parent=20453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/categories?post=20453"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/tags?post=20453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}