{"id":20102,"date":"2019-09-10T17:07:32","date_gmt":"2019-09-10T17:07:32","guid":{"rendered":"https:\/\/blogs.ufv.ca\/announce\/?p=20102"},"modified":"2019-10-29T18:48:33","modified_gmt":"2019-10-29T18:48:33","slug":"parking-and-access-changes-abbotsford","status":"publish","type":"post","link":"https:\/\/blogs.ufv.ca\/building-renewal\/2019\/09\/10\/parking-and-access-changes-abbotsford\/","title":{"rendered":"Parking and access changes &#8211; Abbotsford"},"content":{"rendered":"<p>The following changes are part of the Abbotsford <a href=\"https:\/\/www.ufv.ca\/building-renewal\">Building Renewal Project<\/a>.<\/p>\n<p><strong>Thursday, Sept. 12 only:<\/strong><\/p>\n<p>Access to Lot 7 from McKenzie Road near Building A in Abbotsford will be blocked for 2 hours from 8am to 10am. Site preparation for the Renewal Project will be occurring.\u00a0Access will be through lot 6.<\/p>\n<p><strong>Monday, Sept. 16 onward: <\/strong><\/p>\n<p>Parking spaces in the south half of Lot 7 will be occupied by construction crews and equipment. The north half of lot 7 will remain open for parking.\u00a0Please allow extra time to find parking and walk to your campus destination.<\/p>\n<p><strong>Accessibility spaces:<\/strong><\/p>\n<p>Accessibility spaces have been relocated to the north portion of Lot 7. Two stalls have been added to K building.<\/p>\n<p>For a virtual <a href=\"https:\/\/blogs.ufv.ca\/blog\/2019\/09\/a-new-reality-virtually-visit-the-new-building-k\/\">sneak peek of<\/a> Building K, visit the library rotunda in Building G on Wed. Sept. 11 from 10:30 to 2:30.<\/p>\n<p><strong><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-20103 alignleft\" src=\"https:\/\/blogs.ufv.ca\/announce\/files\/2019\/09\/Lot-7-parking-640x610.png\" alt=\"\" width=\"640\" height=\"610\" \/><\/strong><\/p>\n<p>Thank you for your patience as these substantial improvements begin. They will ultimately enhance the learning and physical environment for students, faculty, and staff.<\/p>\n<p>Here\u2019s a list of <a href=\"https:\/\/www.ufv.ca\/building-renewal\/frequently-asked-questions\/\">FAQ\u2019s<\/a> on this project or for more information, please contact Campus Planning at <a href=\"mailto:building.renewal@ufv.ca\">building.renewal@ufv.ca<\/a> or Facilities Management at 604-854-4542.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The following changes are part of the Abbotsford Building Renewal Project. Thursday, Sept. 12 only: Access to Lot 7 from McKenzie Road near Building A in Abbotsford will be blocked for 2 hours from 8am to 10am. Site preparation for the Renewal Project will be occurring.\u00a0Access will be through lot 6. Monday, Sept. 16 onward: &#8230; <a title=\"Parking and access changes &#8211; Abbotsford\" class=\"read-more\" href=\"https:\/\/blogs.ufv.ca\/building-renewal\/2019\/09\/10\/parking-and-access-changes-abbotsford\/\" aria-label=\"More on Parking and access changes &#8211; Abbotsford\">Read more<\/a><\/p>\n","protected":false},"author":217,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[],"class_list":["post-20102","post","type-post","status-publish","format-standard","hentry","category-building-renewal","category-news"],"_links":{"self":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20102","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/users\/217"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/comments?post=20102"}],"version-history":[{"count":1,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20102\/revisions"}],"predecessor-version":[{"id":20452,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/posts\/20102\/revisions\/20452"}],"wp:attachment":[{"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/media?parent=20102"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/categories?post=20102"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ufv.ca\/building-renewal\/wp-json\/wp\/v2\/tags?post=20102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}